Last News
Government Case Study
Oct 05, 2021| By Ibrahim Elbouhissi
Share

The client is a central forum for international cooperation on financial and economic issues and is a key international arena for questions of global governance. The forum brings together the leaders of both developed and developing countries from every continent to discuss financial and socioeconomic issues. Requirements The client wanted to test their system capacity […]

The client is a central forum for international cooperation on financial and economic issues and is a key international arena for questions of global governance. The forum brings together the leaders of both developed and developing countries from every continent to discuss financial and socioeconomic issues.

Requirements

The client wanted to test their system capacity to handle concurrent users during peak load hours. Identifying performance issues and eliminating them on priority was also the prime concern. Their entire infrastructure was also to be tested for reliability and recoverability in case of power failure.

Challenges Involved

  • Ensuring that infrastructure can recover from power failures by utilizing backup batteries.
  • Ensuring that network bandwidth is enough to handle estimated traffic.
  • Ensuring that infrastructure can recover from network failure
  • Verifying different algorithms in the router to get the best reliable performance
  • End-to-end testing of all points of failure.

Our Approach & Solutions 

  • Load Testing– We identified the best load balancing method for the system that will bring the best performance and reliability. We also optimized the load balancing between multiple data centers.
  • Firewall Testing- We reconfigured the firewall to make sure it would not cause performance degradation. It required several rounds of traffic generation and also tuning firewall settings.
  • Storage Testing– We reconfigured the storage to allow the best performance and reliability with  RAID (Different storage array combinations). We also ensured that infrastructure is available even if one of the storage devices gets removed. We also verified that reliable backup is in place and restore time is also within agreed times.
  • Power Testing– We tested the entire infrastructure for power failures and ensured that necessary measures were taken for quick recovery.

Tools Used

  • JIRA
  • Jmeter
  • Nipper
  • Neo Load

Team Strength

  • 1 Test Lead
  • 2 Senior Test Engineer
  • 3 Test Engineers

Results and Value Delivered

  • Establish DONE criteria at User Story, Sprint, and Release levels after requirements review is completed.
  • All high-priority test cases were executed, and actions were taken based on findings. 
  • Process framework is established to take Go/No-Go decisions based on quantitative information.
  • No application performance complaints by the users.

Client Testimonial

“Our engagement with the TestCrew team proved to be very rewarding for us. All efficiencies in our systems were identified and remediated earlier than we expected. Their engineers are very knowledgeable, flexible, and professional. Cheers.”

 

Related Case Studies
Case Study
Corporate learning portal for PayPal
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
Case Study
Corporate learning portal for PayPal
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
Case Study
Dedicated social game development center
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
Case Study
Corporate learning portal for PayPal
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.